Building Stage Inspection Checklist for Nigeria
What to check at each stage of a house build, from setting-out to snagging, especially if you manage the project from abroad.
Most building defects are cheap to fix before they are covered and costly after. Use this checklist, or hire an independent inspector.
In this guide
Before you start
- Approved drawings and building permit
- Bill of quantities and written specification
- Written contract with stage payments linked to verified work
- Named registered architect and engineer
Setting-out and foundation
- Plot boundaries and setbacks match the drawing
- Excavation depth and bearing surface as designed
- Reinforcement size, spacing and cover before pouring
- Concrete mix and curing records
Columns, beams and slabs
- Reinforcement and formwork checked before concrete
- Levels and plumbness
- Services sleeves placed before casting
Walling and roofing
- Block quality and bedding
- Lintels and openings
- Roof structure, fixings and waterproofing against the specification
Services and finishes
- Conduits and pipes tested before covering
- Plaster, screed, tiling and joinery quality
- Windows, doors and fittings as specified
Completion
- Snagging list with dates
- As-built check
- Handover documents and warranties
Paying contractors
Link each payment to a stage that has been verified on site, and keep dated photographs. Landiz does not hold or release project money, but we can tell you what the site shows. See Independent Project Supervision.
This guide is general information, not legal advice. Laws and registry practice differ by state and change over time. Confirm specifics with an independent Nigerian lawyer. Last reviewed 2 November 2026.